Voted one of the top three most luxurious developments in London
THE TIMES
DescriptionManufacturer
Acoustic double glazing throughout  
CAT5 Computer and Telephone cables installed  
Component (HD) video format  
Centralized Broadband  
Remote access and control of the property over the web (security enabled with password) as detailed above Requires separate subscription
Concierge call button on Crestron touch panel near front door  
10 year Construction Guarantee NHBC
Lift Thyssen Krupp
Day Porter shared between 81 and 82. Office in 81.  
Common Parts - Tessellated tiles to Entrance Hall  
Common Parts - Carpet to stairs and landings  

The above specification may be subject to change, although the standard and level of finishes will be commensurate with those already installed in the Show Apartment (81/2). Every apartment is being individually fitted out and therefore finishing items such as tiling and flooring etc listed above will be different in each apartment.The audio visual, lighting, security, control system and airconditioning will however be the same specification throughout. All flats have the above functionality but do not include user hardware supplied as standard. Ie - NO TVs (except those listed above), DVD player, SKY box, Radio or sound server.

Tusk developments